(a) The ACO shall withhold or withdraw acceptance of a contractor’s purchasing system when there are actually main weaknesses or when the contractor is not able to provide enough data upon which to produce an affirmative determination. Monitor the position of each purchase order whilst capturing, categorizing, and matching to https://contractorpurchasingsyste59239.affiliatblogger.com/85791237/top-guidelines-of-contractor-purchasing-system-review