Working with the orientation of the present floor joists will keep away from being forced to rebuild the shower ground or Slash into it drastically to run plumbing. You need to match the drain overall body concerning joists and, using a linear drain allow space for it to run parallel https://harryy568vvv0.mycoolwiki.com/user